The Solutions

Choose one of our most common problems below to see how our machines solved it with ease.

Our machines cover a wide range of services, and can be the solution to your rail logistics problems.

I have bridge/viaduct improvements that require track removal.

View Solution

I have a green field site and need to construct a new line.

View Solution

I have a large distance in which I need to install sleepers over.

View Solution

I need to install sleepers on a single line.

View Solution

I am working in a difficult location with an overhead line.

View Solution

Is it only track panels that can be lifted with the panel lifter?

View Solution

Would I need to provide additional labour to work with the panel lifter?

View Solution

I need to remove track panels and transport them to an access point.

View Solution

I need to remove track panels and reinstall them.

View Solution

I need to lift a track panel, what are the limitations?

View Solution

There are Adjacent Lines Open next to the line I want to re-rail.

View Solution

Is there a maximum rail transportation length?

View Solution

I need to transport S&C ironwork.

View Solution

I need rails positioned on the line furthest from the access point.

View Solution

Can the TRT’s offer me any advantage over other plants?

View Solution

I have CWR I need to install.

View Solution

The CWR has been dropped/located on the wrong track.

View Solution

I need to install new CWR.

View Solution

I need to remove long lengths of rail.

View Solution

The UK’s no.1 rail handling and rail logistics

We have installed over

2056812

feet of rail safely in 2015
We have installed to date

feet of rail safely in 2016
We have handled over

936000

feet of scrap rail in 2015
We have handled to date

feet of scrap rail in 2016