+44 (0) 1465 831 350

Grab a coffee

Read the latest in rail and McCulloch news

f
TAGS
H

Network Rail High Output

McCulloch Rail have been working successfully for Network Rail High Output Doncaster assisting their renewal trains.  The TRTs primarily re-position rails helping the High Output system to continue delivering excellent results. We were approached to carry out a trial to install the 3rd rail using our TRTs. Having carried out this work before we knew our machines were up to the challenge and as you can see from the attached article, the TRTs installed the 3rd rail effortlessly.

Article taken from the latest edition of Rail Infrastructure Magazine.

Manoeuvring the third rail into place