+44 (0) 1465 831 350

THE PROBLEM

I need to remove long lengths of rail.

I need to remove long lengths of rail and position them ready for collection as scrap rail at a later date.

VIEW SOLUTION BELOW

THE SOLUTION

If your challenge involves re-railing or rail logistics, the TRT is the machine for the job.

Once the rail has been unclipped the TRT can remove and transpose any size rail from 15ft to 1418ft and position them in the CESS, 4ft, 6ft opposite 4ft or any position required depending on individual site constraints.  Our staff will then cut the rail to the desired length for uplift. 


MACHINE COMBINATION BELOW

TRT™

The TRT is the safest, most versatile, rail handling machine on the rail infrastructure.

THE UK’S NO.1 RAIL HANDLING AND RAIL LOGISTICS